Grand Avenue Reconstruction - 1st Street to 5th Street

Booneville Road Reconstruction SW 100th Street to 115th Street

Ashworth Road Phase 4 - 88th Street (South) to 88th Street (North) & Bridges over I-80

88th Street Reconstruction - Ashworth Road to Abram Drive

2021 PCC Reconstruction Program (Vine Street 12th Street to 14th Street)

South Grand Prairie Parkway - Mills Civic Parkway to Stagecoach Drive

South Grand Prairie Parkway - Stagecoach Drive to Grand Avenue

Grand Avenue West Segment 5B and 7A Sewers

Grand Avenue - Grand Prairie Parkway to South 115th Street

West Grand Business Park & Booneville Road

Booneville Road Bridge over Johnson Creek

SE County Line Road

Holiday Park Access Road

Holiday Park Little League Stormwater Pump Station Relocation

South 35th Street and Grand Valley Culvert Replacement

Sugar Creek Conveyance Improvements Phase 2

2021 PCC Patching Program

2021 HMA Resurfacing Program

Engineering Services YouTube Channel - Drone videos of construction projects
 Project  Information Updated
SUGAR CREEK CONVEYANCE IMPROVEMENTS PHASE 2

Estimated Start: Winter 2020

Estimated Completion: Fall 2021

Contractor: PCI

Project Overview: The project will include the grading of Sugar Creek from Raccoon River Drive bridge to the confluence of the Raccoon River. The stream grading includes re-grading the foreslopes of the stream as well as grading a floodplain bench on the south side of the stream. Construction activities will include tree clearing, grading, placement of revetment, surface restoration, and all other related work.

Project Status: The contractor has substantially completed the project and will be working on punch list items.

Vicinity Map of the Project

Drone Flyover of the Project

12/10/2021

Ashworth road phase 4 - 88th street (South) to 88th street (north) & bridges over i-80 Estimated Start:  Spring 2021

Estimated Completion:  240 Working Days

Contractor: Jensen Construction Co.

Project Overview: The project is being administered by Iowa Department of Transportation. The scope of the project includes constructing two new bridges over I-80 and removing the existing bridge. They will be constructing the necessary storm sewer and paving connecting the prior Ashworth Road projects.

Project Status: The contractor has placed fill material for the bridge, installed water main and storm sewer. They have poured the eastbound bridge deck and continue to work on the bridge rail.

Posted Detour Map for Ashworth Road Closure Starting Monday, August 16th at 6:00 am

Ashworth Road Overall Plan Layout

Vicinity Map of the Project

Drone Flyover of the Project

12/10/2021
grand avenue reconstruction 1st street to 5th street

Estimated Start:  April 19 2021

Estimated Completion: Late Fall 2021

Contractor: Corell Contractor

Project Overview:  The project will remove all existing pavement and widen the roadway from 1st Street to just east of 5th Street. There will be storm and sanitary sewer improvements along the corridor.

Project Status: Grand Avenue will be reopened to through traffic by December 17th.

Grand Avenue Overall Plan Layout

Stage 1 Plan

Vicinity Map of the Project

Drone Flyover of the Project

12/10/2021
holiday park little league stormwater pump station relocation Estimated Start:Spring 2021

Estimated Completion:Spring 2022

Contractor: Corell Contractor

Project Overview:Construct Holiday Park Little League Stormwater Pump Station Relocation including all labor, material and equipment necessary to construct approximately 488 linear feet of storm sewer in open cut 15-inch and 16-inch, 538 linear feet of force main, 12-inch in open cut, drain manhole, storm manholes, storm intakes, sediment manhole 2 pump submersible pump station, electrical and control, excavation, backfill, connections to existing sewers, abandonment of existing storm sewers, surface restoration, traffic control and miscellaneous associated work, including cleanup.

Project Status: The contractor has a few fence replacement items to complete as well as punch list items.

Vicinity Map of Project

Drone Flyover of the Project

12/10/2021
2021 pcc patching program Estimated Start:Spring 2021

Estimated Completion:Fall 2021

Contractor: Shekar Engineering

Project Overview: Portland Cement Concrete (PCC) Patching at various locations including approximately 215 LF of PCC curb and gutter replacement, 596 SY of reinforced 7" PCC full depth patching, 359 SY of reinforced 8" PCC full depth patching, 5000 SY of reinforced 9" PCC full depth patching, 235 SY of reinforced 7" PCC full depth patching (IA DOT 5 Hr. PCC Mix), 266 SY of reinforced 8" PCC full depth patching (IA DOT 5 Hr. PCC MIX), 2296 SY of reinforced 9" PCC full depth patching (IA DOT 5 Hr. PCC MIX), 40 SY of PCC partial depth patching, median repair, intake reconstruction, manhole adjustments, drives, sidewalks, traffic control, traffic loops, and other miscellaneous work to complete the project.

Project Status:The contractor is finishing the remaining patches this week. They are working on EP True Pkwy east of Valley West Dr.

Vicinity Map of Project

Drone Flyover of the Project

12/10/2021

2021 hma RESURFACING program Estimated Start:Spring 2021

Estimated Completion:Fall 2021

Contractor: Des Moines Asphalt

Project Overview:This project will resurface various locations in the City of West Des Moines. Types of work including approximately 165 tons of HMA HT ½" leveling course, 1,880 tons of HMA interlayer, 2,822 tons of HMA ½" intermediate course, 7,798 tons of HMA HT ½" surface course, 51,922 square yards of surface milling, 35,360 linear feet of crack cleaning and filling, 5,234 square yards of PCC M-4  Mix full depth patching, 594 square yards of PCC 5-Hour Mix full depth patching, 1,093 square yards of PCC sidewalk, 1,228 linear feet of PCC curb and gutter, fixture adjustments, pavement markings, traffic control, and miscellaneous work to complete the project.

Project Status:The contractor will suspend work for the winter and complete the handicap sidewalk ramps in the spring of '22.

Public Notice to the Ashworth Road Residents

Vicinity Map of Ashworth Road Resurfacing

Drone Flyover of the Project

12/10/2021
88th street reconstruction ashworth road to abram drive Estimated Start:Summer 2021

Estimated Completion:Summer 2022

Contractor: Alliance Construction

Project Overview:Construction of the unpaved sections of 88th Street from Abram Drive to Ashworth Road including 5,000 CY of Topsoil, 2,140 CY of Excavation, 10,505 CY of Contractor Supplied Embankment in Place, 13,024 SY of Subgrade Preparation and 13,024 SY of Granular Subbase.  1,935 LF of Storm Sewer and 29 Storm Sewer Structures.  875 LF of Water Main, 2,948 LF of Subdrain, and Subdrain Outlets.  11,026 SY of 9.5inch Reinforced PCC Pavement, 849 SY of 6 inch Reinforced PCC Trail and 1,320 SY of PCC Driveway.  Clearing and Grubbing, Traffic Control, Construction Survey, Erosion Control, Pavement Markings, Seeding, and other Miscellaneous Construction.

Project Status: The contractor has reopened the paved section of 88th Street between EP True Parkway and Century Drive. The contractor completed the underground utility work on stage 2 just south of Ashworth Road but were delayed by utility conflicts and were not able to pave the road back this fall. The road surface has been returned to gravel and reopened to traffic. This section will be closed in the spring of '22 and paved. This segment is expected to be paved by late May.

Stage 3 will be delayed until spring of 2022.

Vicinity Map of Project

Drone flyover of the Project

12/10/2021
south grand prairie parkway mills civic parkway to stagecoach drive
Estimated Start:Spring 2021

Estimated Completion:Fall 2022

Contractor: CTI

Project Overview: Project Description The paving, grading and drainage associated with a future roadway, SW Grand Prairie Parkway from Mills Civic Parkway to Stagecoach Drive.  Project includes 118,000 CY of earthwork, 19,000 SY of paving, 3,700 LF of RCP Storm Sewer, 3,500 LF of Water Main, two single-barrel 10' x 9' reinforced concrete box culvert totaling 670 LF, 10700 LF of open-access conduit network and erosion control.

Project Status:The contractor has paved Stagecoach Drive from South 100th Street to Grand Prairie Parkway. This section will remain closed to the public over the winter but will remain open for a construction entrance to the Grand Prairie Parkway portion of the project.

Utility work and grading on Grand Prairie Parkway have been completed for this year.

Overall Plan Sheet of Grand Prairie Parkway and Stagecoach Drive

Vicinity Map of Project

Drone flyover of the Project

12/10/2021
west grand business park & booneville road
Estimated Start: Spring 2021

Estimated Completion:Fall 2021

Contractor: Alliance Construction

Project Overview: Extension of Raccoon River Drive from Grand Avenue to Booneville Road, reconstruction of Booneville Rd and reconstruction of Glen Oaks Drive, involving earthwork paved roadways and storm sewer, including all materials labor and equipment necessary for the project including the approximate quantities: 9464 SY PCC pavement, 18,000 CY earthwork, 3300 LF of storm sewer pipe.

Project Status:Booneville Road is closed from Glen Oaks south drive to the west 500'.

The contractor has completed the general site grading and underground utility work on much of the project. Paving has been delayed until spring of '22.

Overall Plan Sheet of West Grand Business Park

Vicinity Map of Project

Drone flyover of the Project

12/10/2021
BOONEVILLE ROAD RECONSTRUCTION S. 100TH STREET TO S. 115TH STREET
Estimated Start: Spring 2021

Estimated Completion:Summer 2022

Contractor: Absolute Concrete

Project Overview:This project will include construction of Booneville Road from South 100th Street to South 115th Street. The construction improvements include approximately 21,560 SY of 8-inch, 10-inch, and 12-inch PCC reinforced pavement and 6-inch PCC driveway pavement, storm sewer, watermain, fiber conduit interconnect, subdrain, pavement markings, clearing and grubbing, grading, soil stabilization, traffic control, erosion control, surface restoration, and miscellaneous associated work to complete the project.

Project Status:The contractor is grading and installing underground utilities. Paving is planned for spring of 2022.

Overall Plan Sheet of Booneville Road

Vicinity Map of Project

Drone flyover of the Project

10/11/2021
SOUTH GRAND PRAIRIE PARKWAY - STAGECOACH DRIVE TO GRAND AVENUE

Estimated Start:Summer 2021

Estimated Completion:Fall 2022

Contractor:McAninch Corporation

Project Overview:The paving, grading, and drainage associated with a future roadway, South Grand Prairie Parkway from Grand Avenue to Stagecoach Drive. Project includes 275,000 CY of earthwork, 28,000 SY of PCC roadway paving, 7,500 SY of PCC trail, 11,000 LF of RCP storm sewer, 6,500 LF of water main, 20,000 LF of open access conduit, traffic control, erosion control, pavement markings, and site restoration.

Project Status:The contractor is grading the site so underground utilities may be installed. Underground utility work is planned to occur throughout the winter months or until winter weather prohibits.

Vicinity Map of Project

Drone Flyover of the Project

10/11/2021
grand avenue west segment 5b and 7a sewers Estimated Start:Summer 2021

Estimated Completion:Winter 2021

Contractor: Rognes Corporation

Project Overview:Construct Grand Avenue West Segment 5B and 7A Sewers including all labor, material and equipment necessary to construct approximately 8,970 LF of sanitary sewer in open cut 15-inch thru 36-inch diameter, 125 LF of 15-inch sanitary sewer tunneled in place, manholes, excavation and backfill, connection to existing manhole, connection of existing force main, abandonment of existing 12-inch force main, erosion control, surface restoration, traffic control and miscellaneous associated work, including cleanup.

Project Status:The contractor is installing the trunk sewer along the future Grand Avenue corridor.

Vicinity Map of Project

10/11/2021
GRAND AVENUE - South GRAND PRAIRIE PARKWAY TO SOUTH 115TH sTREET Estimated Start:Fall 2021

Estimated Completion:Fall 2022

Contractor:Elder Corporation

Project Overview:The project includes the construction of PCC pavement, related storm sewer, sanitary sewer, water main, subdrain, earthwork, channel excavation, and SWPPP controls generally located west of the future intersection of South Grand Prairie parkway and Grand Avenue.

Project Status:The contractor is working on underground utilities.

Vicinity Map of Project

Drone Flyover of the Project

12/10/2021
BOONEVILLE ROAD BRIDGE OVER JOHNSON CREEK Estimated Start:Fall 2021

Estimated Completion:Summer 2022

Contractor:Iowa Bridge & Culvert

Project Overview:The project will include construction of Booneville Road Bridge over Johnson Creek. The construction improvements include construction of a 120' -0x47' -2 continuous concrete slab bridge, bridge, approach pavement, bridge monuments, PCC shared use path, 10'x5' precast concrete culvert with headwalls, grading, soil stabilization, traffic control, erosion control, surface restoration, and miscellaneous associated work to complete the project.

Project Status:The contractor is working on the substructure of the bridge.

Vicinity Map of Project

12/10/2021
SE COUNTY LINE ROAD Estimated Start:Fall 2021

Estimated Completion:Fall 2022

Contractor:Elder Corporation

Project Overview:The construction update includes approximately 53,620 CY of earthwork, 16,564 SY of concrete paving, 7,045 SY of concrete shared use path, 986 SY of concrete driveway, 4,229 LF of storm sewer, 4,549 LF of subdrain, 4,634 LF of water main, drainage structures, 144 LF pedestrian tunnel, traffic control, pavement markings, erosion control, and other associated work.

Project Status:The contractor continues grading the site and is working on underground utility installations.

Vicinity Map of Project

Drone flyover of the Project

12/10/2021


PARKS & RECREATION PROJECTS

For more information on Parks & Recreation Projects:
WDM Parks & Recreation Department, City Hall
4200 Mills Civic Parkway, Suite 1B
P.O. Box 65320
West Des Moines, Iowa 50265
Phone: 515-222-3444
Email:
ParkRec@wdm.iowa.gov

WRA SUGAR CREEK STREAM CORRIDOR IMPROVEMENT PROJECT

JORDAN CREEK TRAIL RENOVATION (EP TRUE PKWY TO 50TH ST)

VALLEY VIEW PARK NORTH LOOP ROAD EXTENSION

RACCOON RIVER PARK EXTERIOR LED LIGHTING IMPROVEMENTS

2021 COURT IMPROVEMENTS

CROSSROADS PARK PARKING LOT AND WATER QUALITY IMPROVEMENTS

SUGAR CREEK GREENWAY TRAIL - PHASE 1

CROSSROADS PARK TENNIS COURT LIGHTING IMPROVEMENTS

 Project  Information Updated

WRA SUGAR CREEK STREAM CORRIDOR IMPROVEMENT PROJECT

Estimated Start:Winter 2020
Estimated Completion: Spring 2021
Contractor:  RW Excavating Solutions
Project Overview: Phase 1 of stream corridor improvement project along Sugar Creek between Stagecoach Dr and Booneville Rd. Project is being managed by Des Moines Metropolitan Wastewater Reclamation Authority (WRA) in cooperation with the City of West Des Moines and Iowa DNR. Project goals are to improve public safety, improve water quality, and to protect public infrastructure. Work to include tree removals, shaping of stream bank, placement of riprap, grading for future trail, establishment of native vegetation and replanting of trees.

Project Status: Project is substantially complete. All native seed areas have been seeded and tree plantings are completed.

For additional information see attachments:

Vicinity Map

Letter to property owners along Sugar Creek 03/03/20

Letter to property owners along Sugar Creek 12/10/19

Landscape and Trail Plan exhibit

Sugar Creek Improvements, Phase 1 - Construction Documents

Letter to property owners along Sugar Creek 09/04/20

Sugar Creek Greenway Trail Phase 1 - Construction Documents

10/04/21
JORDAN CREEK TRAIL RENOVATION

Estimated Start: Summer 2021
Estimated Completion: Fall 2021
Contractor:  Des Moines Asphalt & Paving
Project Overview: Full reconstruction of Jordan Creek Trail from EP True Pkwy to 50th Street. Work will include on-site recycling of existing asphalt trail, new trail overlay, and associated improvements including site restoration.  Expect full trail closure to be in place throughout the construction period.

Project Status: Project is substantially complete and the trail is open. In Spring, trail may be closed intermittingly to complete remaining punch list items.

Click here for a vicinity map.

11/22/21
VaLLEY VIEW PARK NORTH LOOP EXTENSION Estimated Start: Spring 2021
Estimated Completion: Summer 2021
Contractor:  Absolute Concrete Specialist
Project Overview: Extension of the north loop road approximately 600 LF to the east. The road is being extended to provide access and parking for a future outdoor pickleball court complex to be located generally in northwest corner of the park. The pickleball complex is anticipated to be completed in Spring 2022. This current phase includes grading, utilities, and pavement of the road and is anticipated to be completed later this summer. 

Project Status: Project is substantially complete.

Click here for a vicinity map

11/22/21
RACCOON RIVER PARK LED LIGHTING IMPROVEMENTS

Estimated Start: Fall 2020
Estimated Completion: Spring 2021
Contractor: Moeller Electric
Project Overview: Project consists of upgrading exterior site lighting with new LED fixtures and poles,
installation of new LED fixtures to paved portion of loop trail, and general upgrades to existing lighting controls.

Project Status: Project is substantially complete.

Click here for a vicinity map

10/04/21
2021 COURT IMPROVEMENTS

Estimated Start:Summer 2021
Estimated Completion: Fall 2021
Contractor:  Minturn Inc
Project Overview:  The project consists of:

  • American Legion Park; reconstruction of tennis court, basketball court, and shuffleboard courts.
  • Jaycee Park; reconstruction of tennis court and basketball court and perimeter improvements to sand volleyball court.
  • Fairmeadows Park; resurfacing of tennis court and basketball and perimeter improvements to sand volleyball court.
  • Willow Springs Park; resurfacing of tennis court and basketball.

Project Status:  Project is substantially complete.

Click here for a vicinity map

11/22/21
CrossROADS PARK PARKING AND WATER QUALITY IMPROVEMENTS

Estimated Start: Fall 2021
Estimated Completion:  Spring 2022
Contractor: Concrete Connection
Project Overview: The project consists of:

  • Parking lot renovation including new parking stalls, new curb and gutter, and asphalt overlay
  • Stabilization of creek channel and construction of a new creek crossing to access skinned infield
  • Water quality measures including bioretention cells and soil quality restoration

 Project Status:  Contractor has completed grubbing and clearing of vegetation along creek channel. New parking stalls near tennis court complex also complete. Contractor currently performing grading operations along creek channel. Please note trail access through park will be closed during construction. In the Spring, park access will need to be closed for several days inorder to complete asphalt overlay. More information will be provided once the work has been scheduled.

Click here for trail closure map

11/22/21
SUGAR CREEK GREENWAY TRAIL - PHASE 1

Estimated Start:Fall 2020
Estimated Completion: Spring 2021
Contractor:  RW Excavating Solutions
Project Overview: This project includes construction of a 12-foot wide PCC trail from Booneville Road to north of Stagecoach Drive. Grading will continue to the south side of Booneville Road, but paving will stop on the north side. The 95th Street Connection is a 10-foot wide connecting spur trail crossing Sugar Creek with a 120'10" long trail bridge. There is a 10-foot wide connecting trail to Booneville Road. There are two short, 10-foot wide connecting trails to the Kings Landing neighborhood to the west. There is a 5-foot wide connecting sidewalk to Stagecoach Drive and a sidewalk along Stagecoach Drive.

Project Status: Project is substantially complete.

For additional information see attachments:

Vicinity Map

Sugar Creek Greenway Trail Phase 1 - Construction Documents

11/22/21
CROSSROADS PARK TENNIS COURT LIGHTING IMPROVEMENTS Estimated Start:  Summer 2021

Estimated Completion:  Summer 2021
Contractor: Van Maanen Electric
Project Overview:   Project consists of adding new LED court lighting to the 6-court tennis complex.

Project Status: Project is substantially complete and push-button activators have been installed. Lights are programmed to activate from dusk to 10:00pm for 30 minute intervals.

Click here for a vicinity map

11/22/21

Posted by: marilynrpolornetess.blogspot.com

Source: https://www.wdm.iowa.gov/residents/streets-construction/construction-updates